banner About title
 Home | Hi-Speed Doors | Environmental | CBRN COLPRO | General Trading | About Union Industries

Union Industries
  About Us
  Hi-Speed Doors
  Lifetime Warranty
  How to Find Us
  Job Vacancies
  Hot off the Press
  Customer 'Gems'
  Success Stories
  C4 "Boss Swap"
  National Business
  Awards (NBA)
  Our History
ISO9001 Logo  IAB logo

 

 

Rescheduling and Complexity for Customised Products Report

Oxford University Research Project in conjunction with Leeds University Business School carried out a research project for one year since June 2005.

There were three participating manufacturing companies:

  • Sulzer Pumps (UK) Ltd.,
  • Clariant plc UK and
  • Union Industries Ltd.

The main objective was to study the relationship between rescheduling and complexity for customised products. The research was carried out by Dr Luisa Huaccho Huatuco with the report published on 31st July 2006.

This research project focuses on the study of the relationship between rescheduling and complexity for customised products. It builds on a previous study that focused on mass produced goods. The main objectives of the project are:

  1. To identify the characteristics of rescheduling.
  2. To describe the rescheduling strategies which are most commonly used in practice.
  3. To modify/adapt the methodology previously used for mass production.

Download 'Rescheduling and Complexity for Customised Products' Report (file size 263Kb)

Related links

Email: enquiries@unionindustries.co.uk
Tel: +44 (0) 113 244 8393 | Fax: +44 (0) 113 242 1307
Union Industries, Angel's Wing, Whitehouse Street, Hunslet, Leeds, LS10 1AD
ISO9001 Certificate No.SP240172 : IAB Registration No. 0044/1